East Arm Wharf
Tie rod lift-off testing.
The scope consists of testing of 140 tie rods on East Arm Wharf Stage 1 to determine service stresses.
A total of 140 tie bars were tested
Work was undertaken in alignment with spring tides
We used an in-house designed and engineered unique Over the Edge Deployment System (OEDS) consisting of 2 engineered 10’ containers complete with ladder system and inertia reel fall arrest system and emergency recovery system