Maintenance of Stokes Hill Wharf

 

Daily management and maintenance of Darwin’s iconic wharf precinct, including:

  • Viaduct and fishing platform

  • Docks, catwalks, gangways, platforms and pontoons

  • Landings and tug berths

  • Commercial eatery areas including service corridors/rooms, and all other non-lettable spaces (internal and external)

  • Public decking, playground and toilets

  • Fencing, gates, balustrades and handrails

  • Carpark

  • Scope also includes a ring route bus service and cleaning services in the main eatery 7 days per week.

2.jpg

Other projects

Pontoon Repair and Refurbishment

  • Repairs and refurbishment of Dock 3 consisting of 2 pontoons

  • The pontoons were rafted from SHW to East Arm to a site at Barge Express. Both pontoons were craned out and transported to the work site further up the yard

  • The pontoons were fully blasted inside and out and coated with the tender specified coatings

  • Welding repairs were carried out and the centre baffle in the gangway pontoon was raised by welding in a 300mm high flat plate

  • On completion of blasting and painting, the pontoons were transported back to the dock edge and craned into the water. The pontoons were then filled with fresh ballast water and levelled out.

Stokes Hill Wharf - Stainless Steel Pipe Installation

  • We successfully completed the installation of a 100mm SS fresh water main reticulation supply to Stokes Hill Wharf

  • Access to the underside of the wharf was achieved using an innovative “Over the Edge Deployment System” designed and engineered by RAM

  • Fabrication, installation, testing, commissioning and maintenance of all specified hydraulic systems, services and equipment.