Baker Hughes
Master Services Agreement
Ongoing works on site, including:
Welding inspection, repair and maintenance
Pressure vessel testing – NATA
Gauge calibration – NATA
Pressure testing SS, poly and CS pipes throughout the plant – NATA
Fabrication and replacement of pipeline spools (weld procedures, welder qualifications, ITPs, installation and pressure testing)
Storage tank internal inspection, blast, paint and test
Torque tool calibration – NATA
Supply of pumps, compressors, gauges, PSV, PRV, vacuum/PSV, hoses, valves, poly pipe fabrication
Development of inspection and test procedures
Acid pipeline lagging
Provision of chemical tanks (to client specifications)
NaOH Tank - UHPW coating removal - internal coating replacement - QA/QC - NACE inspector and confined space permits equipment and gas test atmosphere
Repairs to roof patch, nozzle work and weld splatter removal.
Other projects:
Storage tank, pipework, valve and hose mechanical modifications
Fabrication of 4” 316 SS gun rings and 1” sparge lines
Installation of N2 feed and sample lines into each tank at ground level and into the top of tanks (18m)
Fabrication of spools, thief hatch (c/w N2 inlet), fabrication of 6” poly pipe-works for recirculation
Provision of 4” and 6” chemical hoses. Provision of and installation of wafer valves, trash pumps, non-return valves, flanges, vacuum/PRV and fixings
NATA pressure testing of hoses, pipes, spools, valves and NRV. Blast and coat internal walls and floor of tanks
Connection of water demineralisation plant and filtration skids to provided pipe works and commissioning
Inspection and repair of damaged filtration skids and client containers.